Things are moving along at a pace with lots of different contractors on site. The swimming pool has gone from being just a hole in the ground to the final formed shape with steps in place and some of the filtration system pipework connected.
The school will have two ‘court yards’. The front one will be visible when arriving through the main doors of the school into the reception area. There has been much discussion with architects and artists as to how the space will be used.
Walking around the school it’s now possible to see the different rooms beginning to take shape. The view below shows David and Mark viewing the new staffroom.
View more photos here